top of page
waldorf_astoria_jerusalem.jpg

Waldorf Astoria Hotel

New 900 million NIS building project aimed at bringing a premium brand hotel chain to Israel.

Brought in at the last minute following the collapse of one of the contractors and key product suppliers, LCS provided the experience and knowhow to install intelligent building controls in the hotel.

The project was divided into two parts:

 

Part 1:   Room management

Design and install room control equipment to enhance guest comfort.  (Inncom)

By offering greater control & creating predefined comfort settings for light and air-conditioning that can be pre-activated and changed for different users of the room we are able to enhance the overall comfort and guest experience.  With I-pads in each room, guests could remotely control all settings in the room – regardless of where they are in the hotel.

Through connecting the door lock system and directly linking the HMI system into the hotel Fidelio software package, the hotel could create different lighting and HVAC entrance settings for guests and hotel staff – thereby enhancing further the guest’s comfort level whilst also creating further energy savings.

 

Part 2:   Building Management

Oversee the design and installation of building automation and control for core building functions; electricity, water, HVAC, fire & smoke systems.   

By designing the system to the client’s specific needs and requirements, we were able to offer centralized and remote monitoring, advance warning of system faults and intelligent systems capable of reacting to the needs of the hotel & its guests.  The system was not only easy to maintain but created cost efficiencies and had a short payback period.

אל.סי.אס.מערכות בקרה בע"מ

bottom of page